We were contracted by the Sudbury Design Group to install this frameless glass railing on the Ipe deck of the newly renovated Hyannisport Tennis Club. The project involved fabricating 1/2" tempered 'Starphire' glass panels with polished edges which were then installed to the side and top of the decking using Mergelock stainless steel posts. Stainless steel corner clamps were added for additional bracing and to manage the seasonal movement of the underlying structure.

In addition, we fabricated and installed stainless steel handrails on the steps using Q-Railing components. 