This installation involved the installation of 1/2″ ‘Starfire’ tempered glass onto the side of an Ipe deck. The glass was attached using Q-Railing stand-off mounts every 24″ or so. Additional holes were provided so that the carpenters could attach a wood facia to the deck structure to conceal the fasteners.
This project was completed in collaboration with The Glen Gate Company of Wilton, CT.
In order to provide both pool code compliance and satisfy the building code for guardrails several of the glass panels were fabricated oversize and braced to each other using stainless steel clamps. Gates were installed using stainless steel posts as support.